Search for a word or equipment
 

Time Lapse: Maroon 5 Load In
Theatrecrafts.com > Video > Time Lapse: Maroon 5 Load In


This is a time lapse of the crew loading in the equipment for the Maroon 5, Overexposed Spring tour. Every show day 12 semi trucks of gear is loaded in, does a show, and then is loaded out. There are 115 points to hold the entire rig up in the air and it weighs 112,340 pounds.
Back